Do I need a permit?
Most Adelaide councils require you to apply for a crossover permit before work starts. The crossover sits on council land, so they control the materials, width and construction standard.
Apply at least 7 working days before you plan to start — some councils take longer. Your concreter should know the process for your council area.
A development approval for the house does not always cover the crossover. Norwood Payneham & St Peters and Prospect both say a development approval does not cover work on public land. The City of Salisbury treats a crossover shown on approved plans as approved.
What does each Adelaide council charge and require?
Fees and rules differ by council. The table lists what eight councils published when this page was last reviewed; check the council's own page before lodging.
| Council | Application fee | Timing | Key rule |
|---|---|---|---|
| City of Burnside | $50 | Not stated | Max 4.5 m across the verge; 1.5 m from street trees |
| City of Holdfast Bay | $80 | Not stated | Generally one crossover up to 3.5 m; prefers plain grey concrete |
| Mount Barker District Council | $101 (2026–27) | Not stated | Application for works on a public road |
| City of Marion | $160–$170 listed | 15 business days | 2.0 m from street trees; plain grey inverts |
| City of Charles Sturt | $200 (2026–27) | About 5 business days | Driveway crossover terms and conditions apply |
| Norwood Payneham & St Peters | No lodgement fee | Up to 10 business days | Owner pays for works and redundant crossovers |
| City of Salisbury | Not stated | Up to 10 business days | $20 million public liability cover |
| City of Prospect | See fees register | Not stated | Arterial roads also need state transport authorisation |
What are the common council requirements?
Councils mainly control width, materials, levels and distance from trees and poles.
- Crossover width limits (usually 3–6 metres for residential).
- Materials must meet the council's engineering standard — some require plain grey concrete on the crossover to match the footpath.
- Stormwater must not run onto the road or neighbouring properties. Your driveway needs proper falls and drainage.
- Existing street trees and footpath must be protected or reinstated.
- The finished crossover must handle the expected traffic load.
- A disused crossover has to be closed off with standard kerb at the owner's cost.
How much does a crossover cost to build?
A single-width concrete crossover in Adelaide costs about $1,800–$3,000 to build, and a double-width one $3,000–$5,500, according to a published SA price guide. Widening an existing crossover runs about $1,200–$2,500. Council fees are on top.
The owner pays in every council checked here. That includes kerb changes, footpath repairs and any street tree removal the council agrees to.
How is stormwater managed?
SA development rules require that new hard surfaces manage stormwater quality and minimise runoff. For a driveway, this usually means grading the surface so water runs to garden beds or a drain, not onto the road.
If your driveway significantly increases the hard surface area on your property, you may need a licensed plumber to install underground drainage.
Is a statewide crossover standard coming?
A draft Residential Driveway Crossovers Design Standard has been consulted on in SA. It covers where a crossover can go, separation from street infrastructure, footpath interaction and sight lines, and aims to keep street trees and on-street parking. Construction details such as concrete type and thickness stay with each council.
Common questions
Can I choose exposed aggregate for the council crossover?
It depends on your council. Some require plain grey concrete on the crossover to match the footpath. Others allow decorative finishes. Check with your council before finalising the design.
What if I skip the permit?
The council can require you to remove and rebuild the crossover at your expense. It's not worth the risk — permits are usually free or under $200.
How wide can a driveway crossover be in Adelaide?
It depends on the council. The City of Holdfast Bay generally allows one crossover up to 3.5 m wide. The City of Burnside allows 4.5 m across the verge and 5.5 m at the kerb for a single dwelling, with a 3 m minimum.
How close can a driveway be to a street tree?
Councils set their own distance. The City of Marion requires at least 2.0 m from a street tree and the City of Burnside at least 1.5 m from the face of the tree. Either council can require more for a large tree.
Do I need development approval for a new driveway in SA?
Generally no, for a standalone residential driveway inside your boundary. The crossover on council land is the part that needs authorisation. Heritage areas and work that changes stormwater flow can add requirements, so check with your council.
Who pays for a driveway crossover?
The property owner. Councils including Onkaparinga, Marion, Burnside and Norwood Payneham & St Peters state that the owner pays to build and maintain the crossover between the kerb and the boundary.
Sources
- City of Holdfast Bay: Driveway crossover (Section 221) application
- City of Marion: Driveway access permit
- City of Burnside: Driveways, parking and traffic FAQs
- City of Norwood Payneham & St Peters: Driveway crossover and footpath information sheet
- City of Salisbury: Residential vehicle crossovers
- City of Onkaparinga: Driveway crossover infrastructure responsibility
- YourSAy: Draft Residential Driveway Crossovers Design Standard FAQs
- The Quote Yard: Vehicle Crossovers SA (crossover prices)
Last reviewed .