Curing and timing

How long before you can drive on new concrete?

A new driveway is at its weakest in its first weeks. Concrete gains strength slowly as it cures, and loading it too early is one of the listed causes of cracking. These are the waiting times to plan around, and what changes them in Adelaide.

When can you walk and drive on new concrete?

Walk on new concrete after about 24 hours, drive a car on it after 7 days at the earliest, and keep heavy vehicles off for 28 days.

UseMinimum waitSafer wait
WalkingAbout 24 hoursUntil sealing is finished on exposed aggregate
Cars and light vehicles7 days14 days; 14–21 days is ideal
Trucks, caravans, skip bins28 days28 days

Why does concrete need 28 days?

Concrete grades are measured at 28 days. An N32 mix is one designed to reach 32 MPa of compressive strength 28 days after the pour, and an N25 mix 25 MPa. Before then the slab is still gaining strength.

Curing means keeping moisture in the concrete while that happens. Published SA guidance sets a minimum curing period of 7 days, and 14 days for heavily loaded surfaces. Concreters cure with a sprayed curing compound, wet hessian under plastic, or ponded water.

Does exposed aggregate take longer than plain concrete?

Yes, on site. Exposed aggregate driveways take 2–4 days to build against 1–3 days for plain concrete, because the surface is washed back to reveal the stone and then sealed.

The sealer adds its own waiting time. One exposed aggregate sealer data sheet asks for 24 hours before foot traffic and at least 5 days before vehicles after sealing. The slab's own 7 to 28 day curing period still applies.

How does Adelaide weather change the timing?

Heat and wind dry the surface too fast, and cold slows strength gain. Both change how the job is run.

  • November to March: the higher-risk period for hot-weather concreting. Summer maximums often pass 35°C, with some days above 40°C. Fast surface drying causes plastic shrinkage cracks.
  • Winter: July nights in Adelaide average about 7.6°C, which slows setting and can delay the day you drive on the slab.
  • Rain: June is Adelaide's wettest month and January its driest. Rain on fresh concrete damages the surface, so pours are moved when rain is forecast.
  • Best seasons: autumn and spring, when the weather is mild.

What can go wrong if you drive on it too early?

Driving on concrete too early can crack it or mark the surface. Early trafficking is listed alongside reactive soil movement, overloading and hot-weather shrinkage as a cause of cracking in SA concrete.

Damage from early loading is hard to fix. Cracked bays in exposed aggregate cannot be patched invisibly, because new stone will not match the old.

How should you plan around a new driveway?

Plan for at least a week without the driveway, and two weeks if you can manage it.

  • Park on the street from the day excavation starts. Check permit parking rules if your street has them.
  • Move bins, trailers and anything else you need out of the garage first.
  • Book skip bins and deliveries for after the 28-day mark, or keep them on the road.
  • Keep sprinklers off the slab for the first days if it has just been sealed.
  • Ask the concreter to write the foot-traffic and vehicle dates on the quote or invoice.

Common questions

Can I drive on concrete after 3 days?

No. Three days is too early for a car. Published SA guidance gives 7 days as the minimum for light vehicles and 14 days as safer. Driving on it earlier risks cracks and surface damage that cannot be repaired invisibly.

How long before I can park a caravan or truck on a new driveway?

Wait 28 days. Heavy vehicles should stay off new concrete until it reaches its full design strength, which is measured at 28 days. That includes skip bins, delivery trucks, caravans and boats on trailers.

How long does a concrete driveway take to cure?

Concrete is treated as fully cured at 28 days, when it reaches its specified strength. The minimum active curing period is 7 days. Published guidance treats 14 days as the safer wait for cars.

What is the best time of year to pour a driveway in Adelaide?

Autumn and spring. Mild weather lets concrete cure evenly. Summer heat dries the surface too fast, and winter cold and rain slow the job. Demand is also lower from April to September, which can make booking easier.

What happens if it rains on new concrete?

Rain in the first hours can wash cement off the surface and spoil the finish, which matters most on exposed aggregate. Concreters cover fresh concrete or reschedule the pour.

Sources

Last reviewed .

Related reading

Planning a new driveway?

Tell us your suburb and timing. Up to 3 local concreters can quote the job and confirm when you can drive on it.

Start my quote
Get a free concreting quote